Please use this identifier to cite or link to this item:
https://dspace.ctu.edu.vn/jspui/handle/123456789/35523
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Ngo, Khac Le | - |
dc.date.accessioned | 2020-10-01T00:43:21Z | - |
dc.date.available | 2020-10-01T00:43:21Z | - |
dc.date.issued | 2020 | - |
dc.identifier.issn | 2354-0796 | - |
dc.identifier.uri | https://dspace.ctu.edu.vn/jspui/handle/123456789/35523 | - |
dc.description.abstract | A shipping company ("Claimant") signed with an insurance enterprise ("Respondent") an insurance contract ("Insurance Contract"). At 13:00 on 11/08/2017, the ship carrying 1,100 metric tons of steel scrap left Can Tho port for Hai Phong as port of discharge. At 19:20 on the same day, the ship had arrived at the anchorage area of Dinh An estuary and dropped anchor, waiting for suitable tides to sail further. On 12/08/2017, at 03:00 a.m. the ship heaved up her anchor to continue sailing to Hai Phong. When arriving at buoy No. 20 at 04:10 a.m. she was unable to maneuver, and had to anchor at position of 9o31.012N - 106o21.737E. The chief engineer had checked and reported that the gearbox transmission fitting had a problem, therefore, the ship was unable to sail. | vi_VN |
dc.language.iso | en | vi_VN |
dc.relation.ispartofseries | Journal Vietnam Logistics Review;No. 155 .- P.64-65 | - |
dc.subject | A dispute on new for old | vi_VN |
dc.subject | Insurance | vi_VN |
dc.title | A dispute on new for old insurance | vi_VN |
dc.type | Article | vi_VN |
Appears in Collections: | Vietnam Logistics review |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
_file_ Restricted Access | 681.24 kB | Adobe PDF | ||
Your IP: 3.133.111.221 |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.