Please use this identifier to cite or link to this item: https://dspace.ctu.edu.vn/jspui/handle/123456789/71181
Title: Predicting cost contingency for private projects: Case study in Vietnam
Authors: Nguyen, Tuan Kiet
Kim, Soo Yong
Luu, Van Truong
Le, Van Hung
Le, Huu Dat
Keywords: Cost contingency
Private projects
Regression model
Vietnam
Issue Date: 2020
Series/Report no.: Tạp chí Khoa học và Công nghệ Trường Đại học Công nghiệp Thành phố Hồ Chí Minh;Số 43A - Tr.71-76
Abstract: Actual cost in construction projects has tended to exceed the project budgets. Thus, cost contingency from the initial of the project is the significant budget to complete project activities. Cost contingency is an important element of cost estimation to protect project stakeholders such as owners, contractors, and architects from the risks of the project. This paper reviewed the previous studies to find the factors affecting cost contingency and proposed a regression model to predict the cost contingency for private projects in Vietnam.
URI: https://dspace.ctu.edu.vn/jspui/handle/123456789/71181
ISSN: 2525-2267
Appears in Collections:Khoa học và Công nghệ Trường Đại học Công nghiệp Thành phố Hồ Chí Minh

Files in This Item:
File Description SizeFormat 
_file_
  Restricted Access
1.95 MBAdobe PDF
Your IP: 3.133.153.167


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.